PRE- BUNKER
- CHECK BUNKER IN EACH TANK AND ASCERTAIN THE TANK IN WHICH BUNKER HAS TO BE RECEIVED.
- ENSURE OVERFLOW TANK IS EMPTY AND ITS HIGH LEVEL ALARM IS FUNCTIONAL.
- ENSURE FUEL OIL TRANSFER PUMP IS SWITCHED OFF AND ITS VALVE SHUT.
- CHIEF ENGINEER WILL CONDUCT A PRE BUNKER MEETING WITH BUNKER TEAM WHERE ALL PERSONNEL ARE BRIEFED.
- CHECK LIST PROVIDED BY THE COMPANY MUST BE COMPLETED.
- ON DECK, CHECK AIR PIPE AND VENTS OF OIL TANK WHICH ARE TO RECEIVE BUNKER.
- ENSURE ALL SCUPPER AND DECK OPENING ARE PROPERLY PLUGGED.
- CHECK ALL FITTINGS ON DECK , BUNKER MANIFOLD, ARE IN PLACE AND OPERATIONAL.
- SPILL CONTAINMENT TRAY, MUST BE CLEAN AND DRY AND PLUG IS FITTED. SAFETY NOTICE , DUTIES OF PERSONNEL , TRANSFER PROCEDURE MUST BE DISPLAYED ON BUNKER MANIFOLD.
- S.O.P.E.P EQUIPMENT SHOULD BE KEPT READY AND PORTABLE FIRE EXTINGUISHER ARE READILY AVAILABLE AT BUNKER MANIFOLD.
- SOUNDING TAPE , CALIBRATION TABLE SHOULD BE READY AT HAND.
- SAMPLE BOTTLE IS KEPT READY
DURING BUNKERING
- CHECK COMMUNICATION BETWEEN BUNKER MANIFOLD, ENGINE ROOM & BUNKER BARGE.
- APPROPRIATE SIGNAL TO INDICATE BUNKER OPERATION IS GOING ON IS DISPLAYED. RED FLAG IN DAY AND RED LIGHT AT NIGHT.
- INITIAL, MAXIMUM, AND TOPPING OF RATE TO BE PRE DECIDED.
- MAX. ACCEPTABLE MANIFOLD PRESSURE TO BE DECIDED AND CONTINUOUSLY MONITOR.
- BUNKER TANK SOUNDING TO CHECKED CONTINUOUSLY.
- VISUALLY CHECK AND ASSES THE CONDITION OF BUNKER HOSE.
- CHECK CONNECTION IS PROPER BETWEEN BETWEEN BUNKER MANIFOLD AND HOSE.
- OPEN INLET VALVE AND START BUNKERING AT SLOW RATE.
- CHECK MANIFOLD PRESSURE AND CRACK OPEN SAMPLING VALVE.
- CHECK FOR LEAK AT OTHER BUNKER MANIFOLD THAT ARE NOT IN USE.
- CHECK SOUNDING OF OTHER TANK TO ENSURE THAT BUNKER IS BEING RECEIVED IN CORRECT TANK.
- DURING OPERATION UPDATE CHECKLIST.
AFTER BUNKERING
- SHUT THE INLET VALVE.
- AS SOON AS THE HOSE IS DISCONNECTED FIT THE FLANGE ON THE HOSE TO PREVENT ANY LEAKAGE.
- ALLOW OIL TO SETTLE BEFORE TAKING FINAL SOUNDING.
- THREE SAMPLE BOTTLE ARE TO BE FILLED WITH SAMPLING CONTAINER AND SEALED IN PRESENCE OF SURVEYOR.
- SAMPLE BOTTLE ARE SIGNED BY CHIEF ENGINEER AND SUPPLIER REPRESENTATIVE.
- ONE SAMPLE BOTTLE IS GIVEN TO SUPPLIER ONE TO SHORE LABORATORY AND ONE KEPT ON BOARD.
No comments:
Post a Comment