SEWAGE TREATMENT PLANT
STARTING PROCEDURE
- APPLY POWER TO CONTROL PANEL AND CONFIRM SOURCE LAMP IS ON.
- CONFIRM THE DIRECTION OF ROTATION OF DISCHARGE PUMP, TURN PUMP SWITCH TO MANUAL.
- SHUT STOP VALVE AND OPEN DRAIN VALVE FOR BIO FILTER TANK.
- INTRODUCE CLEANING WATER WHEN INDICATOR LAMP SHOWS HIGH LEVEL SHUT CLEANING WATER.
- OPEN TREATMENT WATER OUTLET VALVE, PUMP DISCHARGE VALVE AND OVERBOARD DISCHARGE VALVE
- TURN THE DISCHARGE PUMP TO AUTO ,PUMP SHOULD START AUTOMATICALLY AND WHEN WATER LEVEL DROPS PUMP SHOULD SHUT DOWN.
- CHECK QUANTITY OF OIL IN BLOWER , CONFIRM ITS DIRECTION OF ROTATION.
- OPEN AIR LIFT VALVE AND SHUT AIR SCOUR VALVE.
- START THE AERATION BLOWER.
- CHECK THE DISINFECTANT QUANTITY.OPEN SEWAGE SUPPLY VALVE TO THE PLANT
MAINTENANCE
- WEEKLY: CHECK QUANTITY OF DISINFECTANT (HYPOCHLORITE)
- BIWEEKLY: CHECK QUANTITY OF OIL AND CLEAN AIR FILTER OF BLOWER,CHECK CONDITION OF V- BELT.
- MONTHLY: CLEAN BIO FILTER TANK SCREEN.BACK FLUSH AND REMOVE SLUDGE.
- BIYEARLY: CHECK INSIDE COATING FIX CORRODED PART.
BACK FLUSH
- SHUT DISCHARGE PUMP.
- STOP BLOWER.
- OPEN AIR SCOUR VALVE AND SHUT AIR LIFT VALVE,
- TURN LOWER SWITCH ON AND LET IT RUN CONTINUOUSLY FOR ABOUT 30 MINUTES.
- OPEN AIR LIFT VALVE AND SHUT AIR SCOUR VALVE AND RESTART THE PLANT.
SEWAGE PLANT CLEANING.
- CLOSE THE INLET VALVE AND DRAIN THE TANK,
- FILL THE TANK AND FLUSH 3-4 TIMES
- OPEN THE MANHOLE.
- VENTILATE FOR 24 TO 48 HOURS.
- CHECK THE OXYGEN CONTENT AND PRESENCE OF POISONOUS AND EXPLOSIVE GASES.
- MAKE RISK ASSESMENT.
- PREPARE ENCLOSED SPACE PERMIT.
- 2 PERSON - 1 WILL ENTER WITH SCBA AND FRESH WATER HOSE.
- FLUSH THE INSIDE WALL AND DRAIN.
- CHECK THE INSIDE COATING AND CORRODED PARTS ETC.
No comments:
Post a Comment